Catch a budget overrun before month-end by seeing when logged hours or project costs will run out at the current pace. The breakdown shows the arithmetic, flags the cards consuming the most time, and waits for your approval before posting to Hive.
Install Prompt
Copy this prompt and paste it into your AI agent to install.
What problem does this solve?
A project can use most of its hours while the calendar says it is half done. Often this shows at month end, when it is late to change the plan. The numbers are in Hive, but they sit in separate places: time on each card, estimates on each card, and a budget panel. Someone must add them up and compare them with the dates.
This Blueprint asks one question: at this rate, when does the project run out of budget? It does not forecast with a model. It divides, and it shows the division.
How does it work?
This Blueprint is a budget alarm for one Hive project. It tells you the date the budget runs out at the pace so far, and which cards used the most time. It reads the time logged on the cards, the hours planned, and the money budget. It shows each step of the arithmetic. It posts the numbers to the project only after you approve them. It is not a weekly report.
Status: built and run. Last run on Nov 19, 2026, in Claude with the Hive connector, on a live Hive workspace.
- Pick the project. You give the project name, the start date, the end date, and an alert limit. Claude finds the project in Hive and asks you to confirm it.
- Read the cards. Claude reads the cards of the project, including finished cards and cards in its sub-projects, in pages of 25.
- Work out the hours. Claude adds the logged time in total and for each person. The hours budget is the sum of the card estimates, or a figure you give. Claude shows: hours used, share of budget used, share of calendar used, and the gap in points.
- Work out the run-out date. Claude divides hours logged by days used to get the pace. It divides the hours left by the pace to get the days left. It rounds the days down and adds them to today. This is a straight line, and Claude says so.
- Rank the cards. Claude lists the three cards with the most hours and their share of the total. It also names any card that is over its own estimate.
- Add the money, if Finance is on. Claude reads the budget baseline and the cost from Hive Finance and does the same division. If Finance is off, Claude shows the project's money budget and says that spend is not available.
- Report, then post on request. You get "Flag" or "No flag", a small table, and the lines of arithmetic. After your yes, Claude posts the result as a status update, with the status you choose.
Example from our run on a sample project with 4 cards: the plan was 70.0 hours, from 4 estimates. The team had logged 30.0 hours (42.9%) in 16 of 39 days (41.0%). The pace was 1.875 hours a day. 40.0 hours left at that pace is 21.3 days. The budget runs out about Dec 9, 2026, two days before the end date of Dec 11. The card "Menu redesign" used 16.0 hours, which is 53.3% of the total. Claude flagged the project, because the run-out date was before the end date, and posted the numbers after approval. In a second test with Hive Finance on, a sample project had a budget baseline of 3,775.00 and a cost of 3,535.00 (93.6%) after 48 of 60 days. At that pace the money ran out 9 days before the end date, and Claude flagged it.
What's the biggest win?
You see a budget problem while you can still act on it. Each number comes with its formula and its source, so you can check it and show it to a finance lead. The card ranking tells you where the time went.
What's required to run this?
- A Hive workspace and the Hive connector in Claude. Set-up steps: https://hive.com/integrations/claude?utm_source=g2&utm_medium=blueprint&utm_campaign=budget-burn
- A Hive project with cards. People must log time on the cards. Cards need estimates, or you give an hours budget.
- The project start date and end date.
- For money: a money budget on the project. For spend: Hive Finance, an add-on to the Teams plan (+ $12 for each user each month on hive.com/pricing), with a budget baseline on the project.
- The skill file from this Blueprint, added to Claude as a skill or pasted as the first message.
What are the constraints?
- It reads time logged on cards. Time entered only in a Hive timesheet is not counted.
- The hours budget is the sum of the card estimates, or a figure you give. A card added later raises it. Cards with no estimate add nothing, and Claude lists them.
- Cards in sub-projects are counted. We tested one sub-project with one card.
- If the post changes the project status, Hive notifies the other people who have access to the project. If the status stays the same, it notifies nobody.
- The run-out date is a straight line from the pace so far. It does not know about a slow start, a busy end, or a holiday. It counts calendar days, weekends included.
- In Hive Finance, the cost figure includes approved hours at their cost rates.
- With no budget baseline in Finance, Claude writes "No budget baseline set".
- The only write is the status update, and only after your yes.
- One project in each run. If the project has more than 100 cards, Claude stops and asks you for a sub-project.
- We tested it in Claude, in a workspace with one member.
Tools in this Blueprint
About This Blueprint
- Industry
- Advertising & Marketing
More Blueprints to explore
Send Weekly Product Defect Reports
Catch product defects before scattered support tickets obscure a rising trend. Weekly reports group faults by product and type, compare them with the prior four weeks, and include customer photos and quotes for faster quality investigations.
Urska Blagojevic
GTM Lead at Yuma AI (YC W23)
Fix Wrong AI Agent Answers Before They Recur
Stop the same support mistake from frustrating customers again: trace incorrect Yuma replies to the Handbook, missing order data, failed actions, or bugs, then test a proposed fix before publishing it. A weekly report highlights recurring causes and the next tickets to investigate.
Urska Blagojevic
GTM Lead at Yuma AI (YC W23)
Onboard a new agency client in Hive from a project template
Avoid a client’s first week starting with unowned tasks or a missing kickoff. The setup shifts template dates, flags weekend deadlines and open owners, then verifies approved updates in Hive before handing over a week-one list and welcome-note draft.